SHUREN HYDROPOWER PLANT PROJECT

What's a key objective of the project? 

The key goal of the Shuren Hydropower Plant Project is to supply the electricity demanded by the mining sector and to fill electricity shortfall faced by the country. Secondary goals are to provide renewable energy, enable energy independence from the Russian power system and a low-cost supply of renewable energy

What have been completed  within framework of the proposed  project?  
Pre-Feasibility Studies  of the project has been completed. 

What's going on with this project at present? 
Terms of Reference  (TORs) of Regional Environmental Assessment ( REA) is  being  drafted.   

What's going to happen in future?  
- Finalize the  TORs of REA,  
- Conduct REA,
- Carry out Environmental and Social Impact Assessment ( ESIA),
- Develop Feasibility Studies,  

For more detailed information: 

Please visit to Related  reports and material on your right hand side as well as  to  Consultation Overview   in Consultation Overview.