FLOW REGULATION OF THE ORKHON RIVER AND CONSTRUCTION OF RESERVOIR COMPLEX PROJECT

What's a key objective of the project? 

The study would investigate the possibility of diverting surface water from Orkhon River to the south where the population of Gobi is facing  the challenges of safe drinking water source and supply and where the mining industry may become water stressed due to the possibility of depleting groundwater. The proposed scheme will present modality and schedule of the utilization of both groundwater and surface water to meet future demands in an optimal way.

What have been completed  within framework of the proposed  project?  
The Initial screening study has been completed,

What's going on with this project at present? 
Terms of Reference  (TORs) of Regional Environmental Assessment ( REA) is  being  drafted.  
What's going to happen in future?  
-  Finalize draft TORs of REA,  
-  Conduct REA,  
-  Conduct Environmental and Social Impact Assessment ( ESIA),
- Conduct Feasibility Studies, 

For more detailed information: 

Please visit to Related  reports and material on your right hand side as well as  to  Consultation Overview in Consultation Overview.