MINING INFRASTRUCTURE INVESTMENT SUPPORT PROJECT

Contract Awarded (CQS)

Project Name: MINING INFRASTRUCTURE INVESTMENT SUPPORT PROJECT (MINIS)

Country: Mongolia

Project Ref: Selection of consulting firm to develop HYDROGEOLOGICAL MAPPING 1:200’000 SCALED

Loan No.4888MN 

Contract No. WB/MOF/MINIS/CS/CQS/3.1.15/2019

LOT 1: 

Awarded Firm: Erdene Drilling LLC (Lead partner) and Dunar Od LLC (JV) (Mongolia)

Address: Narnii zam, 14th khoroo, Bayanzurkh district, Ulaanbaatar, Mongolia   

Contract signature date: 29 May 2019

Method of Procurement/Selection: Selection Based on the Consultants Qualification (CQS)

Price: 251,543,850.00 MNT 

Duration: 5 months

Summary scope of contract:


Consulting services (“the Services”) shall produce 1:200’000 scaled hydrogeological map on L-49-XXIV, L-49-XXX, L-50-XIX, L-50-XXV nomenclatures and equip 3 water supply wells with automatic watering sensor for wild animals in the selected mapping area.


LOT 2: 

Awarded Firm: Dunar Od LLC (Main consultant) and Uran Salaa LLC (Sub consultant)(Mongolia)

Address: Baigal ordon #7 Zanabazar street, 16th khoroo, Bayangol district, Ulaanbaatar, Mongolia

Contract signature date: 30 April 2019

Method of Procurement/Selection: Selection Based on the Consultants Qualification (CQS)

Price: 264,278,000.00 MNT   

Duration: 6 months

Summary scope of contract:

Consulting services (“the Services”) shall produce 1:200’000 scaled hydrogeological map on L-49-XXIV, L-49-XXX, L-50-XIX, L-50-XXV; L-50-XIII, L-50-XIV, L-50-XV, L-50-XX, L-50-XXI nomenclatures and equip 3 water supply wells with automatic watering sensor for wild animals in the selected mapping area.


Share:
MINIS

MINIS